MEPCO New Connection 2026 – Apply Online, Charges, Documents & Complete Procedure
Getting a new electricity connection from Multan Electric Power Company (MEPCO) is an important process for homeowners, tenants, businesses, shops, offices, and other eligible consumers in the MEPCO service area.
If you are constructing a new house, moving into a newly purchased property, opening a commercial business, or requiring a separate electricity connection, you can apply through the applicable Electricity New Connection (ENC) process.
The application process generally involves submitting your personal and property information, providing the required documents, completing verification and site inspection, receiving a demand notice, paying the applicable charges, submitting the required wiring documents, and waiting for meter installation.
This complete guide explains the MEPCO new connection process in 2026, including online application, required documents, connection charges, load categories, demand notice, estimated processing time, application tracking, offline application, common problems, and frequently asked questions.
If you already have a MEPCO connection and want to check your electricity bill, you can use our MEPCO Bill Check service. You can also use our MEPCO Bill Calculator to estimate your monthly electricity expenses.
Important: New connection requirements, charges, processing times, forms, and technical conditions may change. Always verify the latest requirements through the official ENC and MEPCO channels before submitting an application or making a payment.
What Is a MEPCO New Connection?
A MEPCO new connection is a new electricity supply connection provided to an eligible consumer within MEPCO’s distribution area.

A new connection may be required when:
- A newly constructed house needs electricity.
- A new shop or office is being opened.
- A property does not have an existing electricity connection.
- A separate connection is required for a portion of a property.
- A commercial or industrial facility requires electricity.
- A consumer needs a new meter at an eligible location.
The connection type, sanctioned load, meter requirements, technical feasibility, and applicable charges depend on the nature and requirements of the application.
Who Can Apply for a MEPCO New Connection?
Different types of consumers may apply for a new connection, subject to applicable requirements and approval.
Residential Consumers
Homeowners and eligible applicants can apply for electricity connections for:
- Houses
- Apartments
- Residential buildings
- Newly constructed properties
- Other eligible residential premises
Commercial Consumers
Commercial connections may be required for:
- Shops
- Offices
- Restaurants
- Schools
- Small businesses
- Commercial buildings
Industrial Consumers
Industrial connections can be required by:
- Factories
- Manufacturing facilities
- Industrial units
- Workshops
- Large-scale commercial projects
The applicable process and technical requirements can differ significantly according to load and connection category.
Apply for MEPCO New Connection Online 2026
The online application process makes it easier for eligible consumers to submit a new electricity connection request without immediately visiting a MEPCO office.

Applications can be submitted through the official Electricity New Connection (ENC) system managed by Power Information Technology Company.
Official Online Application Portal
You can access the ENC online application portal to begin the new connection application process.
Steps to Apply for a MEPCO Connection Online
- Open the official ENC portal.
- Select the option for a new electricity connection.
- Choose MEPCO as the distribution company.
- Enter your personal information.
- Provide your CNIC details.
- Enter your full name.
- Provide an active mobile number.
- Enter the complete connection address.
- Provide the required property information.
- Upload the requested documents.
- Review all information carefully.
- Submit the application.
- Save your application information and tracking details.
After successful submission, a Tracking ID or application reference may be provided through the available communication channel.
MEPCO New Connection Application Requirements
Before starting your application, prepare all relevant information and documents.

Having complete documents ready can reduce the possibility of delays caused by missing information or incorrect documentation.
You may need information such as:
- Applicant’s full name
- CNIC number
- Mobile number
- Property address
- Connection type
- Required load
- Ownership details
- Property documents
- Applicant’s contact information
The exact requirements can depend on the type of connection and the circumstances of the application.
Documents Required for MEPCO New Connection
Providing the correct documents is one of the most important parts of the new connection process.

Your documents are used to verify your identity, property status, location, and eligibility.
Common Documents Required
Depending on the application, documents may include:
- Copy of CNIC
- Proof of ownership
- Registry
- Sale deed
- Allotment letter
- Property documents
- Sworn affidavit or undertaking
- No Objection Certificate where applicable
- Power of Attorney where applicable
- Neighbor’s electricity bill for location verification
- Wiring test report
- Proof of no outstanding dues where required
The exact documentation should be confirmed according to your connection type and current MEPCO requirements.
Documents Required for Tenants
If you are applying as a tenant, additional documentation may be required.
A tenant may need:
- CNIC copy
- Tenancy agreement
- Owner’s consent or NOC
- Property ownership documents
- Affidavit or undertaking where required
- Other documents requested by MEPCO
Requirements can vary depending on the circumstances, so applicants should verify the current requirements before submitting the application.
Documents for Multiple Property Owners
When a property has multiple owners, additional documentation or authorization may be required.
Depending on the situation, this can include:
- CNIC copies of owners
- Ownership documents
- Authorization
- Power of Attorney
- NOC or undertaking
Make sure that names and ownership information are consistent across the documents.
Documents for Commercial and Industrial MEPCO Connections
Commercial and industrial applications can require additional business and site-related documentation.
Depending on the type of connection, applicants may be asked for:
- Company registration certificate
- CNIC copies of directors or authorized persons
- Company documents
- NOC
- Site map
- Ownership or tenancy documents
- Load requirements
- Wiring test documentation
- Other technical documents
Large-load connections can involve additional technical assessments and approvals.
MEPCO New Connection Procedure – Step by Step
The MEPCO new connection process can involve several stages from application submission to meter installation.

A typical process may include:
Step 1 – Submit the Application
Submit your new connection application through the applicable online ENC system or through the relevant MEPCO office.
Step 2 – Receive Tracking Information
After submitting the application, keep your Tracking ID or acknowledgment receipt.
This information can be useful when checking your application status.
Step 3 – Document Verification
The submitted information and supporting documents are reviewed.
If documents are missing or incorrect, additional information may be requested.
Step 4 – Site Inspection
Where required, a MEPCO representative may inspect the proposed connection location.
The inspection can help determine technical feasibility and connection requirements.
Step 5 – Cost Estimation
After the relevant verification and technical assessment, the applicable connection cost may be calculated.
Step 6 – Demand Notice
If applicable, a Demand Notice is issued showing the amount that needs to be paid for the next stage of the connection process.
Step 7 – Pay the Demand Notice
Pay the applicable amount through the authorized payment channel specified for the application.
Always keep your payment receipt.
Step 8 – Submit Required Payment/Wiring Documents
After payment, submit the required receipt and other documents, such as the wiring test report where applicable.
Step 9 – Application Processing
The application moves through the applicable approval and priority process.
Step 10 – Material and Meter Arrangement
Once the application reaches the relevant stage, required material and meter arrangements are completed according to availability and applicable procedures.
Step 11 – Meter Installation
The electricity meter is installed at the approved location after the required conditions have been fulfilled.
What Is a MEPCO Demand Notice?
A Demand Notice is an official document issued during the connection process that specifies charges payable by the applicant before the connection can proceed to the next stage.
The amount can depend on factors such as:
- Connection type
- Sanctioned load
- Distance and technical requirements
- Meter type
- Material requirements
- Installation requirements
- Applicable fees and charges
The demand notice amount should be treated as the applicable amount for your particular application rather than relying on an estimate from an unrelated website.
How to Pay the MEPCO Demand Notice
Once the demand notice has been issued:
- Review the applicant and connection details.
- Check the amount payable.
- Use the authorized payment channel.
- Complete the payment.
- Obtain and preserve the payment receipt.
- Submit or upload proof of payment where required.
- Continue tracking your application.
Do not throw away the receipt. It may be needed if there is a payment verification issue.
MEPCO New Connection Charges 2026
The cost of a new MEPCO electricity connection is not necessarily the same for every applicant.
Charges can vary according to:
- Connection category
- Required load
- Meter type
- Installation requirements
- Material requirements
- Technical feasibility
- Location
- Applicable government or regulatory charges
Therefore, applicants should verify the current demand notice and official charges applicable to their particular connection.
Estimated MEPCO Connection Cost
An online estimate can help you understand the possible cost structure, but it should not be considered a guaranteed final price.
The final payable amount is determined according to the applicable official assessment and demand notice.
Possible cost components may include:
- Meter cost
- Installation charges
- Cable/material charges
- Store-related charges
- Security deposit where applicable
- Connection-related charges
- Other applicable fees
Why MEPCO New Connection Charges Can Differ
Two applicants may receive different demand notice amounts because their connection requirements are not necessarily identical.
For example, a small residential connection and a high-load commercial connection can require different equipment, technical work, and approvals.
Types of MEPCO New Connections by Load
MEPCO connections can be categorized according to applicable load requirements.

The load category can affect the application process, technical assessment, approval requirements, and expected processing time.
Category 1 – Up to 15 kW
This category can include relatively lower-load consumers such as:
- Residential homes
- Apartments
- Small shops
- Small offices
- Other low-load premises
The processing time may be shorter than higher-load connections, subject to document verification and technical feasibility.
Category 2 – 16 to 70 kW
This category can be relevant to:
- Medium commercial businesses
- Schools
- Offices
- Small manufacturing units
- Other medium-load premises
Additional technical requirements may apply depending on the requested load and location.
Category 3 – 71 to 500 kW
Higher-load consumers can include:
- Industrial units
- Factories
- Large commercial projects
- High-load facilities
These applications may require more detailed technical assessment and additional processing.
Note: The categories and processing times shown on this page are intended as a general guide. Confirm the applicable category and current requirements through MEPCO/ENC before applying.
MEPCO New Connection Processing Time
The time required to obtain a new connection can vary.
Factors that can affect processing include:
- Application completeness
- Document verification
- Site survey
- Technical feasibility
- Demand notice issuance
- Payment verification
- Wiring test
- Material availability
- Meter availability
- Connection load
- Workload in the relevant MEPCO area
Approximate Process Timeline
| Application Stage | Approximate Time |
|---|---|
| Application submission | 1 day |
| Site survey | Several days |
| Cost estimation | Several days |
| Demand notice | Depends on processing |
| Payment verification | Depends on payment channel |
| Wiring verification | Depends on requirement |
| Material arrangement | Depends on availability |
| Meter installation | Depends on approval and availability |
These are general estimates, not guaranteed delivery times.
How Long Does a MEPCO New Connection Take?
Lower-load connections can often follow a simpler process, while higher-load connections may require additional technical evaluation.
A connection that has complete documents and no technical complications may progress more smoothly than an application with missing documents, property issues, or technical constraints.
If your application appears to be delayed beyond the expected timeframe, check its status through the ENC system or contact the relevant MEPCO office.How to Track MEPCO New Connection Status Online
After submitting your application, tracking the application is important.
You can use the available ENC tracking facility to check your application progress.
Steps to Track Your Application
- Open the official ENC portal.
- Select the relevant tracking option.
- Enter your Tracking ID or application information.
- Provide the required CNIC information if requested.
- Submit the details.
- Review the current application status.
Keep your Tracking ID safely until your connection has been successfully installed.
MEPCO New Connection Tracking by CNIC
Depending on the available ENC tracking facility, applicants may need their CNIC and application tracking information to access their application status.
If your information is not accepted, verify:
- CNIC number
- Tracking ID
- Application number
- Mobile number
- Other requested information
Avoid submitting incorrect information repeatedly.
MEPCO New Connection Status Meaning
Your application status may change as it moves through different stages.
Common stages can indicate:
- Application received
- Under verification
- Site survey pending
- Site survey completed
- Cost estimation
- Demand notice issued
- Demand notice paid
- Payment verification
- Wiring test pending
- Approved
- Material pending
- Meter installation pending
- Connection completed
The exact status names can differ depending on the system and current application process.
Download MEPCO New Connection Form
Applicants who prefer the traditional application method may be able to submit a manual application through the relevant MEPCO office.
Before using an old form downloaded from an unofficial website, confirm that the form is still valid and accepted by the concerned MEPCO office.
Offline Application Process
- Obtain the applicable MEPCO new connection form.
- Complete your personal information.
- Enter the property address.
- Specify the required connection/load details.
- Attach the required documents.
- Sign the application where required.
- Submit the application to the relevant MEPCO subdivision/office.
- Obtain an acknowledgment or receipt.
- Keep copies of all submitted documents.
Online vs Offline MEPCO New Connection Application
Both online and offline routes can be useful depending on your circumstances.
| Feature | Online Apply | Offline Apply |
|---|---|---|
| Application submission | Online | MEPCO office |
| Document submission | Digital/upload where supported | Physical copies |
| Tracking | ||
| Office visit | May be reduced | Usually required |
| Suitable for | Applicants comfortable online | Apply needing in-person |
The official ENC system should be used where online application is available for your connection type.
MEPCO New Connection Wiring Test Report
A wiring test report may be required during the connection process.
The report helps confirm that the internal electrical wiring has been inspected and meets the applicable requirements before the electricity connection is energized.
Important Wiring Guidelines
- Use a qualified electrician.
- Ensure proper wiring and protection.
- Use suitable electrical equipment.
- Check earthing.
- Avoid overloaded circuits.
- Ensure the installation is safe.
- Obtain the required test report where applicable.
Never attempt unauthorized work on MEPCO equipment or the electricity meter.
Important Tips Before Applying for a MEPCO New Connection
A few simple checks can prevent avoidable delays.
1. Use the Correct CNIC
Make sure the CNIC information in your application is accurate.
2. Provide an Active Mobile Number
Use a mobile number that you regularly access because application updates may be communicated through SMS or other available channels.
3. Upload Clear Documents
If applying online, make sure scans or photographs are clear and readable.
4. Check Property Documents
Confirm that your ownership or tenancy documents are complete before applying.
5. Keep Copies of Everything
Save copies of:
- Application
- CNIC
- Property documents
- Uploaded files
- Tracking ID
- Demand notice
- Payment receipt
- Wiring test report
- Correspondence
6. Track Your Application
Do not submit an application and forget about it. Check its status periodically.
7. Do Not Pay Unofficial Agents
Use authorized payment channels and official processes. Be careful if someone asks for unofficial fees to “speed up” your application.
Common MEPCO New Connection Problems and Solutions
Applicants can sometimes encounter problems during the application and installation process.
Tracking ID Not Received
Possible Reasons
- Incorrect mobile number
- SMS delivery problem
- Email issue
- Application submission problem
What to Do
Check your SMS messages, email inbox, spam folder, and application confirmation details.
If the tracking information is still unavailable, contact the relevant support channel and provide your application details.
MEPCO Application Is Pending
A pending status can occur while documents, technical information, or site inspection requirements are being processed.
What to Do
Check the application status and identify the stage where the application is waiting.
If it remains pending for an unusually long time, contact the relevant MEPCO office with your tracking information.
Demand Notice Not Issued
A demand notice may not be issued until the required verification and technical assessment have been completed.
Possible Causes
- Document verification pending
- Site inspection pending
- Technical feasibility review
- Missing information
- Application issue
Solution
Check your application status and contact the concerned office if the delay continues.
Demand Notice Payment Not Updated
If you have already paid but the payment is not showing as received:
- Keep the original receipt.
- Verify the payment date.
- Check the paid amount.
- Confirm the application details.
- Contact the relevant office with proof of payment.
Do not pay a second time until the first payment has been properly checked.
Meter Installation Is Delayed
Meter installation can depend on approval, payment verification, material availability, and operational workload.
Keep your documents and paid demand notice available when following up.
Incorrect Applicant Information
Mistakes in your:
- CNIC
- Name
- Address
- Mobile number
- Property details
- Connection type
can cause delays.
Report important errors as soon as possible through the relevant MEPCO channel.
What Happens After the MEPCO Meter Is Installed?
After the meter is installed, the connection can move into normal electricity billing.
You should:
- Check that the meter details are correct.
- Keep your connection information safely.
- Monitor your meter reading.
- Wait for your first electricity bill.
- Check the bill for correct consumer information.
- Pay the bill before the due date.
Once your first bill is available, you can use our MEPCO Bill Check service to check your bill online.
You can also use our MEPCO Bill Calculator to estimate future monthly electricity expenses.
How to Check Your First MEPCO Bill
After receiving your new connection and the first bill, keep your reference number or consumer information safe.
Your bill can contain information such as:
- Consumer name
- Reference number
- Consumer ID
- Meter number
- Billing month
- Previous reading
- Current reading
- Units consumed
- Bill amount
- Due date
- Taxes
- Other applicable charges
If you want to understand how electricity charges are calculated, visit our MEPCO Bill Calculator page.
MEPCO New Connection for a Newly Constructed House
If you are constructing a new home, it is useful to plan the electricity connection early.
Before applying:
- Confirm property ownership documents.
- Determine your expected electricity load.
- Prepare your CNIC.
- Confirm the property address.
- Check whether a suitable electricity distribution line is available.
- Prepare the required wiring documentation.
- Keep copies of your application documents.
Planning ahead can help reduce delays during construction and occupancy.
MEPCO New Connection for a Shop or Business
Businesses may require a commercial electricity connection depending on their activities and applicable tariff category.
Before applying, consider:
- Expected electrical load
- Equipment requirements
- Business location
- Property/tenancy documentation
- Commercial tariff category
- Wiring requirements
- Possible technical requirements
For larger loads, consult the relevant MEPCO office about the applicable connection category before submitting the application.
MEPCO Three-Phase New Connection
A three-phase connection may be required when the electricity load or equipment requirements exceed what is appropriate for a standard single-phase connection.
Three-phase electricity can be relevant to:
- Larger properties
- Commercial premises
- Workshops
- Industrial facilities
- Equipment requiring three-phase supply
The required load and technical requirements should be assessed before applying.
Can I Increase the Load of an Existing MEPCO Connection?
If your electricity requirements have increased, you may need a load extension rather than a completely new connection.
For example, a consumer may require additional sanctioned load because of:
- New air conditioners
- Additional machinery
- Business expansion
- New electrical equipment
- Increased household demand
The load extension process can involve technical assessment and additional charges.
If you already have an active MEPCO connection, contact the relevant MEPCO office to determine whether a load extension is appropriate.
MEPCO New Connection Safety Guidelines
Electricity installation should always be treated as a safety-critical activity.
Consumers should:
- Use qualified electricians.
- Install proper earthing.
- Avoid overloaded circuits.
- Use suitable circuit protection.
- Keep electrical wiring away from water.
- Never tamper with the electricity meter.
- Never make unauthorized connections.
- Keep children away from electrical equipment.
- Do not work on live electrical equipment.
- Report dangerous electrical conditions to the relevant authority.
Do not attempt to install, modify, or repair MEPCO-owned equipment yourself.
Frequently Asked Questions – MEPCO New Connection
How long does a MEPCO new connection take?
The processing time depends on the connection category, load, document verification, site inspection, technical feasibility, material availability, and other factors. Lower-load connections may follow a simpler process, while higher-load connections can require additional assessment.
How can I apply for a MEPCO new connection online?
You can start the application through the official ENC portal, select MEPCO, enter your personal and property information, upload the required documents, and submit the application.
What documents are required for a MEPCO new connection?
Common documents can include CNIC, ownership proof, property documents, affidavit/undertaking, NOC where applicable, and other supporting documents. Commercial and industrial applicants may need additional business and technical documentation.
What is a MEPCO demand notice?
A demand notice specifies the applicable charges that an applicant must pay during the connection process before the application can proceed to subsequent stages.
Are MEPCO new connection charges fixed?
No. The total cost can vary according to connection type, load, meter requirements, technical conditions, location, and applicable charges. Always check the official demand notice for the amount applicable to your application.
Can a tenant apply for a MEPCO connection?
A tenant may be able to apply subject to the applicable requirements and documentation, which can include the owner’s consent or NOC and tenancy-related documents.
Can I apply for a MEPCO connection without ownership documents?
Property documentation requirements depend on the application circumstances. If you do not own the property, you may need tenancy documents, owner consent, NOC, or other supporting documentation.
How can I track my MEPCO new connection?
Use the available tracking facility on the ENC portal with your Tracking ID and other requested information.
What should I do if my MEPCO application is delayed?
First check the current application status and identify the pending stage. If the application remains delayed, contact the relevant MEPCO office with your Tracking ID and supporting documents.
What happens after paying the demand notice?
After payment verification, the application can proceed through the applicable remaining stages, which may include wiring verification, approval, material arrangement, and meter installation.
Final Words
Applying for a MEPCO new connection in 2026 becomes much easier when you understand the process before submitting your application.
Start by preparing your CNIC, ownership or tenancy documents, property information, and other required records. Submit your application through the appropriate online or offline channel, keep your Tracking ID, complete any required site inspection and verification, pay the demand notice through an authorized channel, and retain all receipts and documents.
The final connection cost and processing time can vary depending on your load, connection category, location, technical requirements, document verification, and applicable MEPCO procedures. For this reason, applicants should always verify the latest requirements and charges before making decisions based on older information.
Once your connection is installed and your first electricity bill is generated, you can use our MEPCO Bill Check service to check your bill online and our MEPCO Bill Calculator to estimate future electricity expenses.
Keep your electricity connection documents, reference number, demand notice, payment receipts, and other records safe for future use.